You are here

EAS | Capabilities

Capabilities

The right capabilities at every stage of a project.
Evans Airport Solutions offers more than simply the supply of equipment. We have in-house design to an award winning standard, ergonomic experts that ensure compliance with legislation and working guidelines as well as some of the industries most experienced project management and install staff to ensure projects are On Time & On Budget.

 

 

Design & Ergonomics

Evans Airport Solutions | NKI design department is run by former NKI design manager, Mrs. Marie Claire Looze. Her team of highly qualified designers handles all aspects of industrial and ergonomic design. Our multiple design innovations are visualized in professional business presentations, and in comprehensive technical and ergonomic visualizations. EAS | NKI is often involved in projects after external designers or project architects already made the conceptual design. In these cases we work closely with developers, consultants and architects to develop these concepts into final high-quality, superior and durable products.

Offering the best match to project requirements, the optimal mix is chosen in terms of functionality and cost. When the design concept has been adjusted to meet all operational requirements, a full-scale prototype is made to allow detailed evaluation of all operational elements and ergonomics.

 

 

 

Engineering & Project Coordination

Evans Airport Solutions engineering department works with highly experienced engineers. Using Autodesk Inventor™, we focus to engineer our products for full CNC and laser manufacturing only in order to reach highest precision and economic pricing.

Our design engineers develop selected concepts in every detail. They work in close co-operation with Evans' manufacturing department in Canada and with external suppliers.

The engineering department is tacked with the complete shop drawing preparation and submissions of all products. They also prepare detailed project layouts for customers to evaluate final integration.  All shop drawings are made using Inventor 3d. Once shop drawings are approved, manufacturing will start under supervision of EAS | NKI’s project co-ordination team.

 

 

 

Project Management

As a project contractor and manufacturer, Evans Airport Solutions only works with ISO qualified suppliers and subcontractors. Before delivery and installation all products are pre-assembled in Evans Airport Solutions facility. This ensures that all components are specification compliant and meet the highest quality standards. Evans Airport Solutions' procedures ensure the shortest and most effective installation time.

Evans Airport Solutions | NKI employs highly effective project managers to ensure that a project will be delivered at the desired quality, on time and within budget.

Every project has unique features that require fit, form and function techniques to ensure successful completion. Evans' project managers optimize results throughout all phases of the project by clearly identifying milestones and objectives. 

At Evans Airport Solutions | NKI, we strive to provide customers with care-free service from project start to completion.

 

 

Manufacturing

With its head office located in Vienna, VA, Evans Airport Solutions has production sites in North America, Europe and Asia Pacific. For specific products our supply chain contains various highly qualified Dutch, German and Belgian manufacturers and suppliers.

Our manufacturing sources build EAS' own counter programs and are fully qualified to engineer and build any custom designed interior and counter program, regardless of material or technical specifications.

EAS' unique interior signage products are made by 3M certified manufacturers, in order to guarantee long life quality.

All manufacturing facilities are ISO 9001 or even ISO/TS 16949 certified.

 

Materials

EAS | NKI utilizes many different materials to create a certain look or achieve a certain function.  Compact Laminate and High-Pressure Laminate are widely used and available in a variety of colors and patterns. Metals and solid surface materials such as Corian, Marble and Granite are many times used as worksurface options. Please consult our sales professionals for the best material for your project. 

 

 

 

Installation

For on-site installation, EAS' highly skilled personnel works closely with our Turn Key Solutions department. On-site support by the project management team ensures that all work is carried out according to Evans Airport Solutions' stringent quality standards and local regulations.

 

 

 

 

 

 

 

Evans Warranty and Support

Evans Airport Solutions' ability to handle complete terminal interior projects is based on proven experience in a vast array of high profile projects. This experience is reflected in the ability to efficiently plan and manage total projects, including all related procurement, subcontracting, project engineering and site management. The end result is a highly flexible, experienced and efficient project organization, dedicated to achieving optimal results for the client.